100 % Pure Polypropylene
Good Dispersion
High Tensile Strength
Best for Concrete Reinforcement
One-stop Service,Strict Quality Control
Synthetic Concrete Reinforcing Mesh Fibers Polypropylene PP Mono-filament Fiber Mesh for Concrete
Product Details
With 100% polypropylene as uncooked cloth,polypropylene pp fiber mesh is produced by way of unique generation.
It appears net-like shape with many mono-filament related. it has gain of acid, alkali resistant, first rate tensile, smooth dispersing,
comfort for production and no damage to vehicles and pavement and no need for special conservation.
It specially utilized in concrete reinforcement,anti-crack concrete and motar.
When the fiber is put into the concrete, the horizontal structure in fiber mono-filament can be destroyed in the course of
reinforced by a great number of polypropylene fibers.
Parameter
Density(g/cm³) | 0.91 | Tensile Strength(Mpa) | ≥ 450Mpa |
Length(mm) | 6,12,18,24,36mm...... | Elastic Modulus(Mpa) | >3500 |
Shape | Beam-like Net | Equivalent Dia(μm) | 100±50 |
Material | 100% polypropylene | Crack Elongation(%) | ≥16 |
Water-Absorbency | No | Melting Point | 160-170 ℃ |
Feature
As a new type concrete-strengthening fiber, it becomes a new popular subject in the field of fiber concrete research and application after glass fiber and steel fiber.
Reinforced Functions to Concrete: compared with steel fiber, full-dispersed polypropylene fiber has advantages in its thinness, large amount, non-water absorbency, strong acid & alkali resistance and similar elastic modulus with that of concrete.
The reinforced functions run as follows:
◆Increase seepage resistance
◆Prolong endurance
◆Improve steel protection
◆Increase cracking resistance
◆Increase fire resistance
◆Strengthen spurt & fatigue
◆Improve tensile, bending & folding strength
◆Improve plastic deformity
◆Strong acid & alkali resistance and good endurance
Application
- Projects like concrete road, bridge, airport road and factory floor which strictly require cracking resistance.
- The wall of tunnels, mines, roofs and reservoir projects with special construction.
- River courses and dams, etc.
- Military defense works, dock banks and piers, etc.
FAQ
Q 1.What is your terms of payment?
A: T/T 30% as deposit, and 70% before shipping the goods.
Q 2. How about your delivery time?
A: Generally, it will take 3 to 7 days after receiving your advance payment.
Submitted successfully
We will contact you as soon as possible